U.S. building precedents: evidence for studio use
Published studio models
| Building | Evidence in hand | Evidence still needed |
|---|---|---|
| Bullitt Center, Seattle, WA — Miller Hull, 2013 | The owner’s drawing set includes dimensioned office floors, cores and openings. The city project file identifies construction permit 6237843, 1501 E Madison St. | The approved code summary and life-safety sheets for the office floor, intermediate levels and both stair discharges to a public way. A construction-type approval does not establish the office egress calculations. Seattle SDCI’s records instructions explain the written-request process for approved plans. |
| Kendeda Building, Atlanta, GA — Miller Hull and Lord Aeck Sargent, 2019 | Georgia Tech’s building manual records dimensions and operating capacities for individual rooms. The indexed Fire Safety Office construction review identifies 2018-CP-109. Georgia’s adoption history places 2012 IBC in the state adoption period. | The actual project code sheet naming the edition, amendments and occupancy classifications; the approved life-safety and site plans with loads, doors, discharge widths and routes. The indexed review letter is not the drawing set. Classroom seating in an operations manual is not a design occupant-load calculation. |
Kendeda Building covers Auditorium 152, the furnished student center, adjacent rooms and two paths beyond the vestibules. Its auditorium dimensions come from the building manual. The architect’s published drawings supply the spatial arrangement. Three auditorium door groups are modeled as individual effective openings.
Bullitt Center uses Levels 2–4 registered to the column grid. The published section and level plans place the street entry on Level 2. Stair protection, widths, travel lengths and the continuation of the rear alley are exercise inputs.
Both cases open as editable copies with sources in the guide and PDF. Analysis applies the app’s IBC 2021 rules to the current drawing. The checklist below describes the outstanding evidence for presenting either project as an approved reference baseline.
Evidence for publishing a permit-verified reference
- Identify the building, construction or alteration scope, authority, adopted IBC edition, dated approval and any applicable alternate means. Document each source sheet and revision. A bid drawing alone does not establish approval.
- Select a manageable part of the plan. Its exit route must continue through every intervening level to a documented exterior discharge/public way. Include people entering shared corridors, stairs or exits from outside the selected area.
- Record a reference calculation for each included room: use, area, net/gross or fixed seating, load factor and occupant load. Match the source widths and distances; mark missing information rather than inventing it. Source dimensions take priority over an image-derived measurement.
- Reconcile the baseline with the actual drawings before describing it as a verified reference. Regression checks should compare specific loads, capacities, distances and complete connections to the source. If the app’s IBC 2021 rules differ from the adopted code, label those results as a separate classroom comparison.
- Students edit a copy. Results describe their revision, not the original building’s permit. Published materials require suitable reuse rights; link to the owner’s drawings when republication is not authorized.